All road work listed below is subject to change due to weather or priority adjustments.

Adair County


Maintenance

Various Routes – filling potholes and repairing shoulders; traffic reduced to one lane; cautionary signs
Various Routes – clearing brush, working on signs, repairing driveway approaches; all lanes open to traffic

Back to Top

Audrain County

Construction Projects:

Route JJ - Resurface from US 54 at Mexico to the end of state maintenance .

Work Zone Info: Inactive - Job has not been scheduled

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

Route B - Resurface from US 54 through Rush Hill to Route J.

Work Zone Info: Inactive - Job has not been scheduled

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

Route KK - Resurface from MO 19 at Laddonia to Route B north of Rush Hill.

Work Zone Info: Inactive - Job has not been scheduled

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

 

Maintenance

Various Routes – repairing shoulders and working on driveway approaches; cautionary signs, flaggers and trucks in work zones.
Various Routes
- pothole patching;
cautionary signs and trucks in work zones.
Various Routes
– clearing brush and chipping;
cautionary signs, flaggers and trucks in work zones.
Various Routes
- drainage work around culverts and bridges;
cautionary signs, flaggers and trucks in work zones.

Back to Top

Clark County

Maintenance

Various Routes – bridge repairs; cautionary signs, flaggers and trucks in work zones.
Various Routes
- pothole patching;
cautionary signs and trucks in work zones.
Various Routes
– repair shoulders on ramps;
cautionary signs and trucks in work zones.

Back to Top

Knox County

Construction

Route E - Safe and Sound Bridge replacement at South Fabius River just south of Newark - Bridge to close February 20, 2012 for 54 days

Work Zone Info: Inactive - Road to be closed at bridge on Feb. 20. Detour over US 36, 61 and Route MM.

Project Status: 0% complete - Demolition to begin on bridge Feb. 20.

Estimated Completion: late March 2012

 

Maintenance

Various Routes – bridge repairs; cautionary signs, flaggers and trucks in work zones.
Various Routes
- pothole patching;
cautionary signs and trucks in work zones.
Various Routes
– repair shoulders on ramps;
cautionary signs and trucks in work zones.

Back to Top

Lewis County

Maintenance

Various Routes – bridge repairs; cautionary signs, flaggers and trucks in work zones.
Various Routes
- pothole patching;
cautionary signs and trucks in work zones.
Various Routes
– repair shoulders on ramps;
cautionary signs and trucks in work zones.

Back to Top

Lincoln County

Construction Projects

Route D - Safe and Sound Bridge replacement at Turkey Creek north of Hawk Point - Bridge to close February 13, 2012 for 51 days

Work Zone Info: Inactive - Road to be closed with detour over MO 47, and Routes H and E.

Project Status: 0% complete- Road to be closed at bridge Feb. 13 for demolition to begin , weather permitting.

Estimated Completion: April 2012

MO 47 - Resurface driving lanes and shoulders from west of Route j to Main St. in Troy

Work Zone Info: Inactive - Job has not been scheduled

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

 

Maintenance

Route 61 – Feb. 6 driving lane will be closed from 8:00 am to 11:00 am weather permitting on southbound lanes at South Lincoln Drive; cautionary signs and trucks in work zone.
Route D – Feb. 6-10 shoulder work two miles south of Route 79 junction; cautionary signs and trucks in work zone.
Route 61 – Feb. 6-10 shoulder repair work from the St. Charles County line to Eolia on both north and south bound lanes; cautionary signs and trucks in work zones.
Route 61 at Cuivre River Bridge – Feb. 9-17 placing rock around piers at the south end of both the north and south bound bridges; cautionary signs and trucks in work zones.
Route 79 – Feb. 6-10 brush and tree trimming along shoulders in south of Elsberry; cautionary signs and trucks in work zones.
Various Routes – pothole patching and other road repair work in various locations on minor routes; cautionary signs and trucks in work zones.

Back to Top

Macon County

Construction Projects

US 63 - Construct wetland mitigation site near intersection of Mesquite St. and Bear Creek west of Sue City

Work Zone Info: Trucks entering and exiting site; majority of work off of roadway.

Project Status: 94% complete- additional fence will be built after surveying, weather permitting.

Estimated Completion: December 2011

Maintenance

Various Routes – filling potholes and repairing shoulders; traffic reduced to one lane; cautionary signs
Various Routes – clearing brush, working on signs, repairing driveway approaches; all lanes open to traffic
Route C – Feb. 15, road closed for culvert replacement between Route T and Harbor Street 7 a.m.-2:30 p.m.

Back to Top

Marion County

Construction

MO 168 - Safe and Sound Bridge replacement at North River west of Philadelphia - Bridge to close January 23, 2012 for 67 days

Work Zone Info: ROAD CLOSED Jan. 23. Detour over Routes Z and C in Marion County and Route Z in Shelby Co.

Project Status: 0% complete - Contractor working on bents, footings and columns. Road closed at the bridge Jan. 23.

Estimated Completion: early April 2012

Route MM - Safe and Sound Bridge replacement at Bear Creek west of Hannibal - Bridge to close February 6, 2012 for 49 days

Work Zone Info: ROAD CLOSED Feb. 6. Detour over US 36, 61 and Route MM.

Project Status: 0% complete - Demolition of old bridge to begin Mon., Feb. 6.

Estimated Completion: late March 2012

Maintenance

Route 61 - pothole patching, sign work; cautionary signs and trucks in work zones.
Route 36 - grinding high joints east of Ely overpass, pothole patching, sign work
; cautionary signs and trucks in work zones.

Back to Top

Monroe County

Construction Projects

Routes 107 and FF - Preventative maintenance on Mark Twain Lake bridges over North Fork and South Fork Salt River on Route 107, and North Fork Salt River Bridge on Route FF; substructure repairs and modifications, expansion joint replacement, removal and replacement of asphalt surface and upgrading the existing guardrail. Contractor- PCI Roads, LLC.

Work Zone Info: Inactive - One lane traffic with 45 mph work zone. Route FF - 14 ft. width restriction from Route V south to Route CC; Route 107 - 19 ft. width restriction from US 24 east to MO 154 west.

Project Status: 0% complete - Preconstruction conference tentatively scheduled for mid-February. Contractor installed safe span.

Estimated Completion: May 24, 2012

Maintenance:

Various Routes – driveway approach and shoulder repairs; cautionary signs and trucks in work zones.
Various Routes
- pothole patching;
cautionary signs and trucks in work zones.
Various Routes
– clearing brush cutting and chipping;
cautionary signs and trucks in work zones.
Various Routes
- drainage work around culverts and bridges;
cautionary signs and trucks in work zones.

Back to Top

Montgomery County

Construction Projects:

Route Y - Resurface from MO 19 south of Big Spring to Route E at Jonesburg in Warren Co.

Work Zone Info: Inactive - Job has not been scheduled

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

Maintenance

Route 19 – drainage work 8:00 am – 3:00 pm; one lane traffic; cautionary signs and flaggers in work zone.
Various Routes – shoulder and edge repairs on minor routes; cautionary signs and trucks in work zones.
Various Routes – pothole patching and other road repair on minor routes; cautionary signs, flaggers and trucks in work zones.



Back to Top

Pike County

Construction Projects:

Route UU - Resurface from US 61 near Bowling Green to US 54 near Louisiana .

Work Zone Info: Inactive - Job has not been scheduled

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

MO 79 - Seal coat from Ralls County line to Route TT near Ashburn.

Work Zone Info: Inactive - Job has not been scheduled until after May 2012

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

 

Maintenance

Routes UU & VV – culvert and ditch work; cautionary signs and trucks in work zones.
Routes U & NN – culvert work
; cautionary signs and trucks in work zones.
Various Routes
– blade outer roads and clear brush; cautionary signs and trucks in work zones.

Back to Top

Ralls County

Construction Projects:

Route T - Resurface from just south of MO 79 to Route N south of Hannibal .

Work Zone Info: Inactive - Job has not been scheduled

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

MO 154 - Resurface from MO 19 to US 54 near Hutchison between Curryville and Vandalia.

Work Zone Info: Inactive - Job has not been scheduled

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

Route E - Seal coat from MO 79 to end of State maintenance near Saverton.

Work Zone Info: Inactive - Job has not been scheduled until after May 2012

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

Route T - Seal coat from Route N south of Hannibal to MO 79 near Ashburn .

Work Zone Info: Inactive - Job has not been scheduled until after May 2012

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

Route V - Seal coat from Ralls Street in New London to Route T.

Work Zone Info: Inactive - Job has not been scheduled until after May 2012

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

Route N - Seal coat from Route T to MO 79 near Saverton.

Work Zone Info: Inactive - Job has not been scheduled until after May 2012

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

Maintenance

Routes DD A H & HH grade and repair driveway entrances and mailbox approaches, shoulder work
Route 61 outer roads - grade and repair entrances and shoulders; cautionary signs and trucks in work zones.
Routes O, N, T, & E –grade and repair entrances and shoulders; cautionary signs and trucks in work zones.
Various Routes - clearing brush; traffic reduced to one lane with flaggers 7:30 a.m. – 3 p.m.
Various Routes - pothole patching; cautionary signs and trucks in work zones.
Various Routes - replace driveway culverts, one lane closure with flaggers, 7:30a.m. - 3:00p.m.




Back to Top

Randolph County

Maintenance

Various Routes – shoulder and approach repairs, drainage work, brush cutting and patching; all lanes open to traffic

Back to Top

Schuyler County

Maintenance

Various Routes - pothole patching; cautionary signs and trucks in work zones.

Various Routes - bridge repairs; cautionary signs and truck in work zones.



Back to Top

Scotland County

Maintenance

Various Routes – bridge repairs; cautionary signs and trucks in work zones.
Various Routes - pothole patching; cautionary signs and trucks in work zones.


Back to Top

Shelby County

See Route 36 Four-Lane Webpage

Maintenance

Various Routes – working on driveway approaches and shoulder repairs; cautionary signs and trucks in work zones.
Various Routes - pothole patching; cautionary signs and trucks in work zones.
Various Routes – clearing brush and chipping; cautionary signs and trucks in work zones.
Various Routes - drainage work around culverts and bridges; cautionary signs and trucks in work zones.


Back to Top

Warren County

Construction Projects:

I-70 eastboundResurface driving lanes and shoulders from the St. Charles Co. line to Wright City

Work Zone Info: Inactive - Job has not been scheduled

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

Route MM - Resurface from Old 40 to Route M at Warrenton

Work Zone Info: Inactive - Job has not been scheduled

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

Route AA - Resurface from Route 47 to the end of state maintenance

Work Zone Info: Inactive - Job has not been scheduled

Project Status: 0% complete- Inactive

Estimated Completion: Summer 2012

Maintenance

Route A – Feb. 6 pipe replacement on driveway entrances; one lane traffic with cautionary signs and flaggers in work zone.
Route 94 – Feb. 6-10 drainage and erosion control from Treloar to the Montgomery County line; one lane traffic with cautionary signs and flaggers in work zone.
Various Routes – Feb. 6-10 sign repairs and replacements; cautionary signs and trucks in work zones.
Various Routes – Feb. 14-17 drainage and erosion control; one lane traffic with cautionary signs and flaggers in work zones.
Route M – Feb. 14-17 shoulder and edge repairs; one lane traffic with cautionary signs and flaggers in work zone.
Route H – Feb. 14-17 shoulder and edge repairs; one lane traffic with cautionary signs and flaggers in work zone.