Services Services Facebook, Twitter, Blog, YouTube, Podcast, Widgets
Our mission is to provide a world-class transportation experience that delights our customers and promotes a prosperous Missouri.

Missouri Highways and Transportation Commission
Career Opportunities
Project Bid Opening Info
Contact Us
Map Request
MoDOT Express Lane
Motor Carrier Services
MoDOT
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888 ASK MODOT
(1-888 275 6636)
Value Engineering Program

Home | About Us | VECP | VE Links | Helpful Documents | VE Contacts

bridgeConstruction VE
Beginning in late 1989 (Federal Fiscal Year 1990) the department added a construction value engineering program. Contractors submit Value Engineering Change Proposals (VECP'S) for department review and approval.

If accepted, the contractor and the department share the total savings on a 50/50 basis. Beginning in 2007, contractors can submit Practical Design Value Engineering Change Proposal (PDVECP). 

If accepted, PDVECP savings are split 25% Contractor/75%.  MoDOT  PDVECP typically consist of an existing feature that could remain a part of the final project, for example, exisiting pavement, an existing pipe, etc. See file below for a summary of the Federal Fiscal Year 2007 Construction VECP's and PDVECP's.

VECP's by Engineering Policy Guide Categories

200 Geometric

300 Bases

400 Flexible Pavement

500 Rigid Pavement

600 Incidental Construction

700 Structures and Hydraulics

800 Roadside Development

900 Traffic Control

1000 Materials

1100 Maintenance Materials

 

Other documents:

 

For any questions or to request a VE study, contact ValueEng@modot.mo.gov

The documents are provided in Acrobat Reader format. Free Acrobat Reader download PDF Icon

   
   
   
   
FlikcrFlickr WidgetsWidgetsPodcastPodcast YouTube YouTubeBlog Blog Twitter Twitter Facebook Facebook